Van's progress ground to a halt this week.  The windows still weren't in (they finally came in today).  Although I had delivered the ceramic tile, the order was messed up and he was short some items.  Those items have been backordered and he should get them this week.  And the exterior siding (actually inside the barn but on the outside of the new room) couldn't be matched with the existing siding.  Something that is "close" has been ordered.  So Van finished the interior siding and the wiring but had to take a pause and do other things while waiting for materials.  Here's some shots of the status as of Sunday 3/4/12.


The ceiling fan was moved from our bedroom - Joan always hated the black fan there.  Track lights were installed (may be usefull when there are some wall mounts).


View into the new room from just inside the cabin door.
Fancy independent controls for fan speed and light dimmer.
The replacement fan in the bedroom (where the black fan came from).